# Grants for Business EV Charging Points

By EV Charge Cables · Published 18 October 2026

**The short version**

UK businesses can access government grant funding through schemes like the Workplace Charging Scheme (WCS) to offset the cost of installing EV chargepoints at their premises.

- The WCS, run by OZEV, covers a portion of purchase and installation costs per socket via an accredited installer
- Eligible applicants include employers of all sizes, charities, and public sector bodies
- Scotland, Wales, and Northern Ireland may offer additional devolved top-up funding alongside the UK-wide scheme

UK businesses can access government grant funding to help cover the cost of installing workplace EV charging points, making the switch to electric fleets and employee charging significantly more affordable. The main route is the Workplace Charging Scheme (WCS), administered by the Office for Zero Emission Vehicles (OZEV), which subsidises a portion of the cost per charging socket. Grant amounts and eligibility criteria are reviewed regularly, so always check [gov.uk](https://www.gov.uk) for the current figures before you plan your installation. If you are also working out which cables and equipment your site will need, our [Guides index](https://www.evchargecable.co.uk/blogs/guides) covers EV charging hardware in plain English.

| Grant / Scheme | Who It Covers | What It Covers | Where to Check |
| --- | --- | --- | --- |
| Workplace Charging Scheme (WCS) | Employers, small businesses, charities, public sector bodies | A portion of the cost per socket, up to a capped number of sockets | gov.uk/workplace-charging-scheme |
| EV Infrastructure Grant for Staff and Fleets | Businesses with larger installation needs (check current status) | Wider infrastructure works beyond the socket itself | gov.uk (confirm scheme is still open) |
| Scotland devolved schemes | Scottish businesses | May supplement OZEV grants; check Transport Scotland | transport.gov.scot |
| Wales devolved schemes | Welsh businesses | Additional support may be available; check Welsh Government portal | gov.wales |
| Northern Ireland schemes | NI businesses | Separate funding available; check the Department for Infrastructure NI | infrastructure-ni.gov.uk |

### What is the Workplace Charging Scheme and how does it work?

The Workplace Charging Scheme is the primary UK government grant for business EV charger installation. Run by OZEV, it covers a portion of the purchase and installation costs for eligible charging sockets, up to a maximum number of sockets per application. Businesses apply through an OZEV-accredited installer, who handles the paperwork on your behalf. You receive the discount at the point of installation rather than as a rebate after the fact. Because the grant amount and cap are reviewed periodically, always check the current figures on gov.uk before requesting quotes.

### Which businesses are eligible to apply?

Eligibility is broader than many businesses expect.

- Private sector employers of any size, including small and medium-sized enterprises
- Charities and not-for-profit organisations
- Public sector bodies and local authorities in some cases
- Businesses that own or lease their premises (leasehold usually requires landlord permission)

Sole traders have historically had a narrower path to WCS eligibility because the scheme targets employers rather than self-employed individuals, but this can change. Check the current eligibility rules on gov.uk rather than relying on older guidance. If you are a sole trader, you may find the EV chargepoint grant for residential properties more relevant if you work from home.

### What equipment qualifies for the grant?

Not every charger on the market qualifies. OZEV maintains a list of eligible chargepoints, and the equipment must meet specific technical requirements, including smart charging functionality. Smart chargers can respond to grid signals and help balance energy demand, which is why the government prioritises them. Your OZEV-accredited installer will only quote eligible units, so this is largely handled for you. That said, it is worth confirming the unit they propose is on the approved list before you sign anything.

### How do you actually apply for the WCS?

The application process runs through an OZEV-accredited installer rather than directly through a government portal.

- Identify accredited installers in your area via the gov.uk installer finder tool
- Get at least two or three quotes, as prices and service quality vary
- Your chosen installer submits the grant application on your behalf before work begins
- Once approved, the grant is deducted from your invoice; you pay only the remaining balance
- Work must be completed by an accredited installer throughout; using an unaccredited contractor voids the grant

Allow enough lead time. Accredited installers can be busy, particularly at the start of a new financial year when businesses plan infrastructure spend. Booking a survey early gives you the best chance of securing a slot and starting the application before any scheme changes take effect.

### Are there additional grants in Scotland, Wales, and Northern Ireland?

Yes. Devolved governments in Scotland, Wales, and Northern Ireland each run their own transport and business support programmes, some of which provide top-up funding alongside the UK-wide WCS. These schemes change independently of OZEV grants, so checking the relevant portal is essential rather than optional. Transport Scotland, the Welsh Government business support pages, and the Department for Infrastructure Northern Ireland are the starting points. If your business operates across multiple nations, you may be able to access different grants for sites in different locations.

### Tips for getting the most out of available grants

- **Act before scheme reviews:** Grant amounts are reviewed and can decrease over time as EV adoption grows. Applying sooner rather than later typically secures better terms.
- **Get multiple quotes:** Accredited installers set their own labour rates. The grant covers a fixed portion; the rest varies widely by installer.
- **Plan your socket count carefully:** WCS grants are capped per application. If you anticipate needing more sockets within a year or two, factor that into your initial installation to avoid a second application cycle.
- **Check VAT position:** VAT on EV charger installation for businesses is subject to standard commercial rates. The grant typically applies to the pre-VAT figure, so confirm with your installer how the final invoice will be structured.
- **Confirm landlord sign-off early:** If you lease your premises, you will need written permission from your landlord before an accredited installer can proceed. Getting this sorted before you apply saves significant delays.

### Frequently asked questions

#### How much does the WCS grant cover?

The grant covers a portion of the purchase and installation cost per socket, up to a capped number of sockets per site. The exact amount is set by OZEV and is reviewed periodically. Do not rely on figures you find in older articles. Check the current amount directly on gov.uk before you plan your budget.

#### Do I need to use an approved installer?

Yes, using an OZEV-accredited installer is a strict requirement. They submit the application on your behalf and the grant is deducted from your invoice. Using a non-accredited contractor means the grant will not be applied, regardless of the quality of the work carried out.

#### Can sole traders apply for the WCS?

The WCS is primarily designed for employers rather than self-employed sole traders. Eligibility for sole traders has been limited in past iterations of the scheme. Check the current gov.uk rules, as these are updated when the scheme is revised. If you are a sole trader working from home, a residential EV charger grant may be more appropriate.

#### Can I get a grant to fund home chargers for my employees?

The WCS covers chargers at your business premises, not at employees' homes. However, employees may be able to apply for a separate residential chargepoint grant in their own right if they qualify. As a business, you can contribute to the cost of a home charger as an employee benefit, with specific tax treatment that is worth confirming with your accountant.

#### What if the scheme becomes oversubscribed or closes?

Government grant schemes can be paused, restructured, or closed when budgets are exhausted. If the WCS is unavailable when you apply, check whether a successor scheme has launched. Some businesses choose to proceed with installation regardless and factor the full cost into their fleet or facilities budget, particularly where the business case for EVs is strong on its own terms.

#### Is VAT charged on top of the grant-subsidised price?

Commercial EV charger installations are generally subject to standard-rate VAT, which is separate from the grant subsidy. The grant typically applies to the net cost before VAT. Your installer should detail how VAT is applied on their quote. VAT-registered businesses can usually reclaim the VAT in the normal way through their returns.

Installing workplace chargers is one of the most practical steps a UK business can take as it moves toward electrifying its fleet. Once your chargepoints are in place, you will want to ensure every vehicle on site can connect. Browse our [EV charging cables by car](https://www.evchargecable.co.uk/ev-charging-cable) guide to match cable types to your fleet, or explore [Type 2 charging cables](https://www.evchargecable.co.uk/type-2-charging-cables) if your vehicles use the most common UK connector standard. For more on workplace and fleet charging topics, visit our [Guides index](https://www.evchargecable.co.uk/blogs/guides).

---

Canonical version: https://www.evchargecable.co.uk/blogs/guides/grants-for-business-ev-charging-points

EV Charge Cables, EV charging cables matched to your car: https://www.evchargecable.co.uk. Some links in this article are Amazon affiliate links; as an Amazon Associate we earn from qualifying purchases at no extra cost to you.
