
Maxus eDeliver 7
Charging cable
Charges about 50% faster on 22 kW public posts than a 7.4 kW cable.
Why this fits your eDeliver 7+−
The Maxus eDeliver 7 has a Type 2 inlet and a three-phase 11kW onboard charger. The 22kW cable carries its full 11kW on three-phase chargers. A 7.4kW cable would cap it. On a single-phase home wallbox both cables charge at the same 7.4kW.
Specifications+−
Delivery & returns+−
Free tracked UK delivery on every order. Built to order in the UK and dispatched fast. 30-day no-fuss returns.
Note: Medium van. 11kW AC; up to 90kW DC. 77kWh or 88kWh.
How long does it take?
Charging
the Maxus eDeliver 7.
The Maxus eDeliver 7 is a medium electric van that arrived in the UK in 2024, aimed at businesses wanting a practical zero-emission workhorse without a premium price tag. It comes with a 77kWh battery in the standard variant and an 88kWh option on certain configurations, giving it the range to handle demanding day routes. The charging inlet is a standard Type 2 socket for AC charging, with CCS for DC rapid top-ups at public fast chargers.
When you charge at a depot wallbox, workplace AC point, or public slow charger, the cable you supply is a Type 2 to Type 2 lead. The eDeliver 7's onboard AC charger supports up to 11kW on three phases, which is significantly quicker than most single-phase home chargers can deliver, so the right charging environment matters. Rapid DC charging up to 90kW uses the charger's own tethered cable and is not affected by which cable you buy.
Select your battery size above to see estimated charge times for both pack options. Rapid (DC) times are for a 10 to 80% charge, the way manufacturers quote them. Real-world charging varies with temperature, battery state and the charger itself.
7.4 kW or 22 kW?
Which cable does
the eDeliver 7 need?
A 5m Type 2 to Type 2 cable covers most depot and workplace charge point scenarios. Because the eDeliver 7 supports 11kW AC across three phases, the cable rating matters more here than it does for single-phase vehicles. A 32A three-phase cable rated to 22kW ensures the van can draw its full 11kW at any three-phase AC point, whether on site or at a public hub.
In practice, most depot wallboxes in the UK are either single-phase 7.4kW units or three-phase 22kW units. On a single-phase 7.4kW charger, the van is limited to 7.4kW regardless of cable rating, so a standard 7.4kW cable is fine for that setup. If your fleet site has three-phase 22kW chargers, choose a cable rated for 22kW to let the van pull its maximum 11kW. A longer 7m or 10m cable is worth considering for vans that may park at varying distances from the charge point.
What does it cost to charge?
Topping up the 77kWh pack from empty costs roughly £6 on an off-peak business tariff of around 7.5p per kWh, or around £21 on a standard rate of roughly 27p. The 88kWh version adds proportionally more, coming to around £7 off-peak or roughly £24 at standard rates. Fleet operators who can schedule overnight charging on a time-of-use tariff will see the biggest savings. Check current tariffs, as business electricity rates vary considerably.
Also for your eDeliver 7
Goes well with.
Maxus eDeliver 7 FAQs
Good
questions.
Still not sure? Our team will confirm the right cable for your vehicle.
Contact usCan the Maxus eDeliver 7 charge at 22kW?+−
Yes, the Maxus eDeliver 7 has a three-phase onboard charger, so with a 22kW cable and a three-phase supply it can charge at up to 11kW.
What length charging cable should I get?+−
5m suits most home and public charge points. Choose 7.5m or 10m if the charge point is far from your car's charging port or you park on the far side of a bay.
What charging cable does the Maxus eDeliver 7 need?+−
A Type 2 to Type 2 cable. The eDeliver 7 uses a standard Type 2 AC inlet, so any Type 2 to Type 2 lead is compatible. For three-phase depot chargers, choose a cable rated to 22kW to make the most of the van's 11kW onboard charger. A 5m length suits most fixed charge points, though 7m or 10m gives more flexibility.
Can the Maxus eDeliver 7 charge at 11kW?+−
Yes, the eDeliver 7's onboard AC charger supports up to 11kW on a three-phase supply. Most UK homes use single-phase power, which caps AC charging at 7.4kW. Depot or workplace three-phase chargers rated at 11kW or 22kW will allow the van to charge at its full 11kW rate.
How long does the Maxus eDeliver 7 take to charge?+−
On a 7.4kW single-phase charger the 77kWh pack takes around 10.5 to 11 hours from empty, making an overnight charge straightforward. On a three-phase 11kW wallbox that drops to roughly 7 hours. For the 88kWh variant, add roughly an hour to each estimate. DC rapid charging at up to 90kW can add substantial range in 30 to 40 minutes.
What length cable is best for the Maxus eDeliver 7?+−
For a fixed depot charge point, 5m is sufficient in most bays. If the van is likely to park at different distances from the charger, a 7m or 10m cable gives enough slack to avoid stretching the lead. Vans at public charge points may also benefit from the extra length, as post spacing varies.



